Booster pump station.

The booster pump station on 99th AVE (It supplies water pressure to the south end of 99th AVE) is three phase 480-volts, it lost power back in August. The culprit was a connection inside the meter base, this is where power from P.S.E comes into for the pump station and is where the power meter plugs into, it is just like it sound. At the time we made a temporary fix until we could get anew meter base and fix it right.

The new meter base finally arrived, Dan from D&D Electric based on Vashon came out last week and of course P.S.E had to disconnect the power to the pump station before we could do anything as three phase 480-volt power will kill you instantly.

With my assistance Dan and I had the new meter base installed and the pump station running normally in four hours.